新疆200万吨/年金浮选厂扩建

案例现场照片

处理方式

  • Integration of a new 初级圆锥破碎机 to handle increased throughput.
  • Existing two-stage crushing circuit (Jaw + Cone Crusher) optimized and retrofitted to form a robust 三阶段破碎系统确保喂料尺寸一致,以下为12毫米,用于研磨。
  • Installation of new, high-efficiency 200立方米浮选槽 to form an expanded circuit.
  • Implementation of a “1-stage Rougher, 3-stage Cleaner, 2-stage Scavenger” configuration for superior selectivity and recovery.
  • Introduction of an advanced 自动试剂定量系统 to optimize collector and depressant usage, particularly for controlling arsenic.
  • DCentralized PLC/DCS 控制系统 integrated with the existing plant control room.
  • Addition of 在线粒度分析仪 (PSD) and pH/ORP 传感器 for real-time process optimization, ensuring stable operation at the expanded capacity.
  • Addition of a second Φ5.0米 x 8.5米 球磨机 operating in parallel with the existing unit.
  • Formation of a closed-circuit grinding system with 水力旋流器 to achieve a target grind size of 80% passing 75µm, essential for liberating fine gold locked in sulfides.
  • New 高效增稠剂 for flotation concentrate dewatering.
  • Installation of a 过滤 presse for the concentrate to produce a low-moisture filter cake, reducing transportation costs.
  • 升级的尾矿泵送系统和管道,连接到现有的尾矿储存设施,旨在处理增加的容量。
  • 能力飞跃: Successfully increased processing capacity by 80万吨/年实现200万吨/年的目标。
  • 恢复提升: Through finer grinding and optimized flotation, the overall gold recovery rate was significantly enhanced by 6.5%.
  • 验证过的EPC能力: Demonstrated strong capability in brownfield project execution, seamlessly integrating new systems with existing infrastructure with minimal disruption to ongoing production.
  • 适应耐火矿石: The flowsheet is specifically designed to tackle the challenges of refractory sulfide gold ores prevalent in the region.
  • 强调生态效率: The expansion prioritized water recycling from the thickener overflow and dry tailing stacking where applicable, aligning with stringent environmental policies in Xinjiang.

产品

解决方案

案例

联系我们

WhatsApp

联系方式