Raw Material: Green Petroleum Coke, Green Needle Coke and High soft point pitch
Prominer can design and provide the complete refinery and smelting system for gold CIL project include loaded carbon Elution & Electro-Winning System and the hydrometallurgy system include reactor, filter, absorber, vacuum system, melting furnace. We can also design the modular type of hydrometallurgy system in containers for small scale project.
Gold Elution & Electro-winning system capacity: 5000kg per patch
Hydrometallurgy system: 200kg gold mud per patch
Oxide gold CIL project, gold CIP project, gold vat leaching and heap leaching project.
Our equipment with the main advantages as below
The elution plant includes an enlarged heat recovery circuit that optimizes solution temperature and flows, minimizing elution time and energy consumption.
The elution plant is built from pre-engineered modules to reduce engineering, delivery, construction, and commissioning time and cost.
Under closed high temperature and high-pressure system, gold-loaded carbon can quickly desorb and electrolyte into gold mud and poor carbon.
After simple pickling and impurity removal, the gold mud obtained can be directly smelted into gold ingots. Using hydrometallurgy, gold ingots can reach a purity of over 99% or 99.99%.
To process gold & silver ore concentrates or pregnant solution, and One-stop smelting system to get gross gold & silver done.
Simple to operate thanks to extensive automation options.
Prominer can provide the service work as below
To find out more about our products and solutions, please fll out the form below and one of our experts will get back to you shortly
3000 TPD Gold Flotation Project in Shandong Province
2500TPD Lithium Ore Flotation in Sichuan
Fax: (+86) 021-60870195
Address: No.2555,Xiupu Road, Pudong, Shanghai
Copyright © 2023. Prominer (Shanghai) Mining Technology Co.,Ltd.