Minerale grezzo: Alluvial gold ore / Vein gold ore after crushing
Grado d'oro: 1.5 – 2.5 g/t
Purezza dell'ingotato d'oro: ≥ 90%
Tasso di recupero dell'oro: 83% – 88%
Prodotto Finale: Gold concentrate & Gold ingot
Tipo di progetto: Small to Medium Scale Turnkey Gold Processing Plant
Capacità: 2 – 10 tons per hour (modular and scalable)
Ambito di Lavoro: Process Design, Equipment Supply, Installation & Commissioning Guidance
Ecco alcune foto del progetto, clicca sulla piccola immagine per visualizzare l'immagine grande.
Di seguito ci sono alcuni modi per gestire questo piano. Se desideri ricevere un piano più dettagliato, clicca sul pulsante per contattarci.
Crushing (Optional for hard rock): A small jaw crusher to reduce vein gold ore to below 20mm for efficient grinding in the Wet Pan Mill.
Amalgamation Barrel: The discharge from the Wet Pan Mill, rich in gold amalgam, is collected and processed in an amalgamation barrel to further concentrate and separate the gold-mercury mixture.
Gold Smelting Furnace: The sponge gold and/or the concentrate from the shaking table are mixed with fluxes (e.g., borax, soda ash) and smelted in a high-temperature furnace to produce pure gold ingots.
Gestione delle Rifiute: A designated tailings pond for the safe storage of neutralized residues, allowing for clear water discharge or reuse.
Powerful Wet Pan Mill (2 or 3 units in parallel): This is the heart of the plant. The ore slurry is fed into the mill, where heavy steel rollers grind the ore with a mixing of water and mercury (if amalgamation process is adopted). The grinding action simultaneously liberates gold particles and promotes the amalgamation of free gold.
Gold Concentrate Shaking Table: The tailings from the amalgamation process or the direct discharge from a mercury-free Wet Pan Mill flow onto a shaking table. This table uses differential gravity to separate and upgrade the remaining free gold into high-grade concentrate.
Water Circulation System: A simple settling pond or tank to recycle process water, reducing fresh water consumption and minimizing environmental impact.
Per saperne di più sui nostri prodotti e soluzioni, si prega di compilare il modulo qui sotto e uno dei nostri esperti ti ricontatterà a breve
Progetto di flottazione d'oro da 3000 TPD nella provincia di Shandong
Flottazione di minerale di litio da 2500TPD in Sichuan
Fax: (+86) 021-60870195
Indirizzo:No.2555, Via Xiupu, Pudong, Shanghai
Copyright © 2023.Prominer (Shanghai) Mining Technology Co., Ltd.