Minério Bruto: Alluvial gold ore / Vein gold ore after crushing
Grau de Ouro: 1.5 – 2.5 g/t
Pureza do lingote de ouro : ≥ 90%
Taxa de recuperação de ouro: 83% – 88%
Produto Final: Gold concentrate & Gold ingot
Tipo de Projeto: Small to Medium Scale Turnkey Gold Processing Plant
Capacidade: 2 – 10 tons per hour (modular and scalable)
Escopo de Trabalho: Process Design, Equipment Supply, Installation & Commissioning Guidance
Aqui estão algumas fotos do projeto, clique na pequena imagem para ver a imagem grande.
Abaixo estão algumas maneiras de lidar com este plano. Se você deseja obter um plano mais detalhado, clique no botão para nos contatar.
Crushing (Optional for hard rock): A small jaw crusher to reduce vein gold ore to below 20mm for efficient grinding in the Wet Pan Mill.
Amalgamation Barrel: The discharge from the Wet Pan Mill, rich in gold amalgam, is collected and processed in an amalgamation barrel to further concentrate and separate the gold-mercury mixture.
Gold Smelting Furnace: The sponge gold and/or the concentrate from the shaking table are mixed with fluxes (e.g., borax, soda ash) and smelted in a high-temperature furnace to produce pure gold ingots.
Gerenciamento de Filtrados: A designated tailings pond for the safe storage of neutralized residues, allowing for clear water discharge or reuse.
Powerful Wet Pan Mill (2 or 3 units in parallel): This is the heart of the plant. The ore slurry is fed into the mill, where heavy steel rollers grind the ore with a mixing of water and mercury (if amalgamation process is adopted). The grinding action simultaneously liberates gold particles and promotes the amalgamation of free gold.
Gold Concentrate Shaking Table: The tailings from the amalgamation process or the direct discharge from a mercury-free Wet Pan Mill flow onto a shaking table. This table uses differential gravity to separate and upgrade the remaining free gold into high-grade concentrate.
Water Circulation System: A simple settling pond or tank to recycle process water, reducing fresh water consumption and minimizing environmental impact.
Para saber mais sobre nossos produtos e soluções, preencha o formulário abaixo e um de nossos especialistas entrará em contato com você em breve
Projeto de Flotação de Ouro de 3000 TPD na Província de Shandong
Flotação de Minério de Lítio de 2500 TPD em Sichuan
Fax: (+86) 021-60870195
Endereço:No.2555, Rua Xiupu, Pudong, Xangai
Copyright © 2023.Prominer (Shanghai) Mining Technology Co., Ltd.