Porject Case

200tph Alluvial Gold EPC processing plant in Zimbabwe

Raw Ore: Alluvial gold ore from river bed
Gold Grade: 0.8 g/t
Gold Recovery Rate: 90%
Capacity: 200 tph
Work Scope: Engineering design, equipment supply and installation guidance

Visit by Appointment

Processing Way

Trommel sieving and washing systems

Centrifugal concentrator

Vibrating Chute

Stationary Chute with the gold catch carpet

Shaking type

Gold smelting furnace

Project Cases

Related Equipment

Regarding the equipment used in the project construction cases.

View More