Raw Ore: Lithium-Rich Hectorite Clay (Li₂O: 0.6-1.0%)
Final Product: Battery-Grade Lithium Carbonate
Product Specification: Li₂CO₃≥99.95%; Fe<10ppm, Na<200ppm
Recovery Rate: 88% (Mine-to-Product)
Capacity: 1.5 million tons ore/year → 22,000 t/year Li₂CO₃
Work Scope: EPC + Local Community Integration
Here are some photos of the project, click on the small picture to view the large picture.
Below are some ways to handle this plan. If you want to get a more detailed plan, please click the button to contact us.
Low-Impact Mining: Surface scraping (no blasting); Rainwater harvesting for processing
Green Conversion: Solar-powered evaporation ponds; Carbonation with CO₂ captured from biogas
Acid-Free Extraction: Water leaching at 80°C; Ion exchange purification
Tailings Valorization:Clay residues → Ceramic raw materials; 100% recirculation of process water
To find out more about our products and solutions, please fll out the form below and one of our experts will get back to you shortly
3000 TPD Gold Flotation Project in Shandong Province
2500TPD Lithium Ore Flotation in Sichuan
Fax: (+86) 021-60870195
Address: No.2555,Xiupu Road, Pudong, Shanghai
Copyright © 2023. Prominer (Shanghai) Mining Technology Co.,Ltd.