Raw Ore: Alluvial & Vein Gold Ore
Gold Grade: 1.2 – 2.5 g/t
Gold Recovery Rate: >88%
Final Product: Gold Ingot
Plant Type: Modular & Mobile Setup
Capacity: 1200 tons per day
Work Scope: Process Design, Equipment Supply, and Installation Guidance
Here are some photos of the project, click on the small picture to view the large picture.
Below are some ways to handle this plan. If you want to get a more detailed plan, please click the button to contact us.
Integrated Crushing & Grinding Module: Jaw crusher and hammer mill for size reduction.
Leaching & Adsorption Module: Flexible CIL/CIP tanks for optimized leaching.
Power & Control Module: Diesel generator + PLC automation for easy operation and mobility.
Gravity Concentration Module: Centrifugal concentrator and shaking table for high-efficiency gold recovery.
Desorption & Electrolysis Module: Integrated elution and electrowinning system for direct gold smelting.
Containerized Design: Quick installation and relocation, ideal for small deposits and pilot testing.
To find out more about our products and solutions, please fll out the form below and one of our experts will get back to you shortly
3000 TPD Gold Flotation Project in Shandong Province
2500TPD Lithium Ore Flotation in Sichuan
Fax: (+86) 021-60870195
Address: No.2555,Xiupu Road, Pudong, Shanghai
Copyright © 2023. Prominer (Shanghai) Mining Technology Co.,Ltd.