Raw Ore: Titanium Zirconium Beach Sand Ore
TiO₂ Grade: 4.5%
ZrO₂ Grade: 3.2%
Final Product: Titanium Concentrate, Zircon Concentrate
Recovery Rate: TiO₂ 85%, ZrO₂ 80%
Capacity: 1000 tons per day
Work Scope: Engineering Design, Equipment Supply, and Installation Guidance
Here are some photos of the project, click on the small picture to view the large picture.
Below are some ways to handle this plan. If you want to get a more detailed plan, please click the button to contact us.
Washing and scrubbing system
High-intensity magnetic separator for titanium separation
Concentrate dewatering and drying system
Spiral separator for roughing and cleaning
Electrostatic separator for zircon purification
Tailings disposal and water recycling system
To find out more about our products and solutions, please fll out the form below and one of our experts will get back to you shortly
3000 TPD Gold Flotation Project in Shandong Province
2500TPD Lithium Ore Flotation in Sichuan
Fax: (+86) 021-60870195
Address: No.2555,Xiupu Road, Pudong, Shanghai
Copyright © 2023. Prominer (Shanghai) Mining Technology Co.,Ltd.