Raw Material: Graphite Flotation Concentrate (95% C)
Project Capacity: 10,000 tons per annum
Final Product: High-Purity Graphite (99.95% C)
Work Scope: Process Design, Equipment Supply, and Installation Supervision
Here are some photos of the project, click on the small picture to view the large picture.
Below are some ways to handle this plan. If you want to get a more detailed plan, please click the button to contact us.
Chemical Purification: Graphite concentrate is mixed with acids (alkalis) in high-temperature reactors to remove metallic impurities and silicate minerals.
Thermal Purification: Further purification by heating in a high-temperature furnace (up to 3000°C) under inert atmosphere to volatilize remaining impurities.
Packaging: Automated packaging in a clean, controlled environment to prevent contamination.
Neutralization & Washing: Neutralization of residual acids and multi-stage washing with demineralized water to achieve neutral pH and remove ions.
Advanced Classification: Precise air classification to meet various particle size distribution (PSD) requirements for different high-end applications.
To find out more about our products and solutions, please fll out the form below and one of our experts will get back to you shortly
3000 TPD Gold Flotation Project in Shandong Province
2500TPD Lithium Ore Flotation in Sichuan
Fax: (+86) 021-60870195
Address: No.2555,Xiupu Road, Pudong, Shanghai
Copyright © 2023. Prominer (Shanghai) Mining Technology Co.,Ltd.