1200 TPD Gold CIP Plant in Peru

Case site photos

Processing Way

  • Insulated leach tanks (double-layer 316L stainless steel with polyurethane insulation)
  • 6-stage countercurrent CIP cascade (32hrs retention time, activated carbon loading ≥6,000g/t)
  • Tailings water treatment: Cyanide destruction → RO membrane concentration → Evaporative crystallization (industrial salt byproduct)
  • Filtered tailings moisture ≤12%
  • Low-pressure desorption unit (0.6MPa operating pressure for low-boiling point adaptation)
  • Plate-frame electrowinning cells (92% current efficiency, +7% vs conventional)

Products

Solutions

Case

contact us

WhatsApp

Contact Form