Location: Tanzania, Africa & Central Kalimantan, Indonesia
Ore Type: Low-Grade Sulfide Ore (1.2–1.8 g/t Au)
Solution: Carbon-in-Pulp (CIP) Process
Scope: EPC Plant Upgrade
Here are some photos of the project, click on the small picture to view the large picture.
Below are some ways to handle this plan. If you want to get a more detailed plan, please click the button to contact us.
Ore preparation (screening & blending) to control feed size ≤2mm
Ore Preparation:Crushing & grinding to 75μm (D80) via SAG mill + ball mill circuit.
CIP Adsorption:8-stage cascade tanks with coconut-shell activated carbon (Au adsorption >99%).
Electrowinning:Steel wool cathodes produce gold sludge (purity 95%).
Water Recycling:Closed-circuit thickeners reduce freshwater use by 70%.
High-Pressure Acid Leaching (HPAL) at 250°C with sulfuric acid
Pre-Leach Concentration:Knelson concentrators recover coarse free gold (+98% recovery).
Elution & Regeneration:Zadra system strips gold from carbon; kiln reactivates carbon (loss <5%/cycle).
Tailings Treatment:Cyanide detox via SO₂/air process (WAD CN⁻ <0.5 ppm).
To find out more about our products and solutions, please fll out the form below and one of our experts will get back to you shortly
3000 TPD Gold Flotation Project in Shandong Province
2500TPD Lithium Ore Flotation in Sichuan
Fax: (+86) 021-60870195
Address: No.2555,Xiupu Road, Pudong, Shanghai
Copyright © 2023. Prominer (Shanghai) Mining Technology Co.,Ltd.