
Raw Ore: Mixed Oxide Type Gold-Copper Ore
Gold Grade: 1.5 g/t
Copper Grade: 0.8%
Recovery Rates: Gold 91%, Copper 85%
Capacity: 1200 tons per day
Work Scope: Process Design, Equipment Supply, and Installation Guidance
Here are some photos of the project, click on the small picture to view the large picture.







Below are some ways to handle this plan. If you want to get a more detailed plan, please click the button to contact us.


Three-stage crushing system to reduce ore size below 15 mm

Neutralization and precipitation process for copper recovery

Tailings treatment with thickener and filter press for dry stacking

High-efficiency Leaching Agitation Tank system with multi-stage countercurrent leaching

Carbon adsorption and elution for gold extraction

PLC-based automated control system for process optimization
To find out more about our products and solutions, please fll out the form below and one of our experts will get back to you shortly
3000 TPD Gold Flotation Project in Shandong Province
2500TPD Lithium Ore Flotation in Sichuan
Fax: (+86) 021-60870195
Address: No.2555,Xiupu Road, Pudong, Shanghai
Copyright © 2023. Prominer (Shanghai) Mining Technology Co.,Ltd.