Raw Ore: Spodumene Lithium Ore
Li2O Grade: 1.5%
Concentrate Grade: 6.0%
Lithium Recovery Rate: 85%
Capacity: 1200 tons per day
Work Scope: Ore Testing, Process Design, Equipment Supply and Installation Guidance
Here are some photos of the project, click on the small picture to view the large picture.







Below are some ways to handle this plan. If you want to get a more detailed plan, please click the button to contact us.


3-stage crushing to reduce ore size below 12 mm

1-stage rougher flotation, 2-stage cleaner flotation, and 1-stage scavenging flotation

Thickener and filter press for concentrate dewatering

Automated control system for process optimization

2-stage ball mill grinding to achieve particle size of 74㎛ and D80

Magnetic separation for iron removal from spodumene concentrate

Tailings pumped to tailings pond after thickening
To find out more about our products and solutions, please fll out the form below and one of our experts will get back to you shortly
3000 TPD Gold Flotation Project in Shandong Province
2500TPD Lithium Ore Flotation in Sichuan
Fax: (+86) 021-60870195
Address: No.2555,Xiupu Road, Pudong, Shanghai
Copyright © 2023. Prominer (Shanghai) Mining Technology Co.,Ltd.