Raw Ore: Free-Milling Oxide Gold Ore
Gold Grade: 1.5-3.5 g/t
Final Product: Dore Gold Bar (Au+Ag≥90%)
Recovery Rate: 88% (Gravity+CIL)
Capacity: 150 tons per day
Work Scope: Modular Design + Installation & Training
Here are some photos of the project, click on the small picture to view the large picture.
Below are some ways to handle this plan. If you want to get a more detailed plan, please click the button to contact us.
Pre-screening & Crushing:Grizzly screen (30mm aperture) → Manual waste removal;jaw crusher → Product size ≤15mm
Grinding & Leaching:Wet pan mill → Grind size 80% passing 75μm;Agitated leaching tank (NaCN 0.05%, pH 10.5);6-stage CIL system (8hrs retention time)
Tailings Management:Cyanide destruction: SO₂/Air process (CN⁻<0.5ppm);Settling pond → Geomembrane liner;Manual sludge removal (quarterly)
Gravity Concentration:2x Knelson CVD32 centrifugal concentrators (recover >0.1mm free gold);Gemini shaking table for fine gold upgrade;Direct smelting of gravity concentrate (Au>60%)
Gold Recovery:Carbon stripping: Zadra process (mini elution column);Electrowinning: 200A rectifier + stainless steel cathodes;Induction furnace smelting (2kg/batch)
To find out more about our products and solutions, please fll out the form below and one of our experts will get back to you shortly
3000 TPD Gold Flotation Project in Shandong Province
2500TPD Lithium Ore Flotation in Sichuan
Fax: (+86) 021-60870195
Address: No.2555,Xiupu Road, Pudong, Shanghai
Copyright © 2023. Prominer (Shanghai) Mining Technology Co.,Ltd.