Raw Ore: Alluvial Gold Ore from River Deposits
Gold Grade: 0.7 g/t (average)
Recovery Rate: 90%
Capacity: 1500 tons per day
Work Scope: EPC Project Transformation
Here are some photos of the project, click on the small picture to view the large picture.
Below are some ways to handle this plan. If you want to get a more detailed plan, please click the button to contact us.
Trommel screening and washing system
Vibrating chute secondary recovery system
Advanced elution and electrowinning system
Tailings management with eco-friendly containment
Primary gravity concentration with centrifugal concentrators
Carbon-in-leach (CIL) circuit for fine gold extraction
Gold smelting furnace for doré production
To find out more about our products and solutions, please fll out the form below and one of our experts will get back to you shortly
3000 TPD Gold Flotation Project in Shandong Province
2500TPD Lithium Ore Flotation in Sichuan
Fax: (+86) 021-60870195
Address: No.2555,Xiupu Road, Pudong, Shanghai
Copyright © 2023. Prominer (Shanghai) Mining Technology Co.,Ltd.