
Raw Ore: Nickel-Cobalt Laterite Ore (Limonite & Saprolite Layers)
Average Feed Grade: Ni: 1.2%, Co: 0.15%
Final Product: Mixed Hydroxide Precipitate (MHP) containing Ni & Co
Final Product: Nickel-Cobalt Mixed Sulfide (MSP)
Target Metal Recovery: Ni ≥ 85%, Co ≥ 80%
Capacity: 1500 tons per day (Operational Pilot for Full-Scale Feasibility)
Work Scope: Pilot Test Program, Modular Plant Supply, Installation & Process Optimization
Here are some photos of the project, click on the small picture to view the large picture.







Below are some ways to handle this plan. If you want to get a more detailed plan, please click the button to contact us.


Ore Preparation & Beneficiation:

Counter-Current Decantation (CCD) & Solution Purification:

Tailings & Residue Management:

Adaptable to Variable Feed: The process flow and equipment are designed to handle the natural variability in Ugandan laterite ore types (limonite vs. saprolite ratio).

Data-Driven Design: The pilot plant is fully instrumented to collect comprehensive metallurgical, operational, and economic data essential for bankable feasibility studies and ESG reporting.

High-Pressure Acid Leaching (HPAL) – Pilot System:

Metal Recovery & Precipitation:

Modular HPAL Pilot Unit: A compact, skid-mounted HPAL system designed to generate accurate scale-up data, process kinetics, and acid consumption rates for a future full-scale commercial plant.

Focus on Water Management: Integrated water recycling circuit from tailings thickener overflow to minimize freshwater intake, a critical feature for sustainable operation.
To find out more about our products and solutions, please fll out the form below and one of our experts will get back to you shortly
3000 TPD Gold Flotation Project in Shandong Province
2500TPD Lithium Ore Flotation in Sichuan
Fax: (+86) 021-60870195
Address: No.2555,Xiupu Road, Pudong, Shanghai
Copyright © 2023. Prominer (Shanghai) Mining Technology Co.,Ltd.