
Raw Ore: Sulfide Copper Ore (with minor pyrite content)
Copper Grade: 1.2%
Concentrate Grade 25% Cu
Copper Recovery Rate: 92%
Capacity: 1500 tons per day
Work Scope: Ore Processibility Test, Engineering Design, Complete Equipment Supply, Installation Guidance & Commissioning Support
Here are some photos of the project, click on the small picture to view the large picture.







Below are some ways to handle this plan. If you want to get a more detailed plan, please click the button to contact us.


Crushing & Screening System: Three-stage closed-circuit crushing circuit (Jaw Crusher + Cone Crusher + Vibrating Screen) to reduce ore size below 12 mm

Flotation System:

Tailings Management System: Tailings are thickened and pumped to a designated tailings storage facility for safe disposal

Auxiliary Systems: Including water supply, power distribution, reagent preparation, and dust collection systems

Grinding & Classification System: Two-stage closed-circuit grinding (Ball Mill + Cyclone classifier) to achieve grinding fineness of 80% passing 74 μm

Dewatering System: High-rate thickener followed by plate & frame filter press for efficient copper concentrate dewatering

Process Control System: Integrated PLC-based control system for real-time monitoring of key parameters (pH, density, grade, etc.)
To find out more about our products and solutions, please fll out the form below and one of our experts will get back to you shortly
3000 TPD Gold Flotation Project in Shandong Province
2500TPD Lithium Ore Flotation in Sichuan
Fax: (+86) 021-60870195
Address: No.2555,Xiupu Road, Pudong, Shanghai
Copyright © 2023. Prominer (Shanghai) Mining Technology Co.,Ltd.