Raw Ore: Sulfide Type Gold Ore (with associated Pyrite and Arsenopyrite)
Gold Grade: 4.2 g/t
Concentrate Grade: 38 g/t
Gold Recovery Rate: 91.5%
Capacity: 1500 tons per day
Work Scope: Engineering Design, Equipment Supply, Installation & Commissioning Guidance
Here are some photos of the project, click on the small picture to view the large picture.
Below are some ways to handle this plan. If you want to get a more detailed plan, please click the button to contact us.
Three-Stage Crushing & Screening:
Pre-Concentration & Flotation Circuit:
Process Control & Automation:
Two-Stage Grinding & Classification:
Concentrate & Tailing Handling: