Raw Ore: Refractory and Semi-Refractory Sulfide Gold Ore
Gold Grade: 2.65 g/t
Gold Ingot Purity: ≥95.5%
Gold Recovery Rate: Increased from 85% to 94% post-expansion
Project Type: Plant Expansion & Process Optimization
Capacity: Expansion from 800 TPD to 1500 TPD
Work Scope: Feasibility Study, Detailed Engineering, Equipment Supply, Installation & Commissioning Supervision
Here are some photos of the project, click on the small picture to view the large picture.







Below are some ways to handle this plan. If you want to get a more detailed plan, please click the button to contact us.


Upgraded Crushing & Grinding Circuit:

Oxidation & Conditioning (For Refractory Ore):

Gold Recovery & Refining:

Plant-Wide Process Control & Automation:

Enhanced Pre-Leaching Concentration:

Expanded CIL (Carbon-in-Leach) Circuit:

Advanced Tailing Management & Environmental Safety:
To find out more about our products and solutions, please fll out the form below and one of our experts will get back to you shortly
3000 TPD Gold Flotation Project in Shandong Province
2500TPD Lithium Ore Flotation in Sichuan
Fax: (+86) 021-60870195
Address: No.2555,Xiupu Road, Pudong, Shanghai
Copyright © 2023. Prominer (Shanghai) Mining Technology Co.,Ltd.