Raw Ore: Silver-Polymetallic Sulfide Ore (containing Ag, Pb, Zn)
Silver Grade: 180 g/t
Lead Grade: 4.2%
Zinc Grade: 5.8%
Final Product: Silver-rich Lead Concentrate & Zinc Concentrate
Recovery Rate: 92%
Capacity: 1500 tons per day
Work Scope: Engineering Design, Equipment Supply, and Installation Guidance
Here are some photos of the project, click on the small picture to view the large picture.
Below are some ways to handle this plan. If you want to get a more detailed plan, please click the button to contact us.
3-stage crushing to reduce ore size below 12 mm
Differential flotation: lead-silver rougher flotation followed by zinc rougher flotation
Tailings are pumped to a tailings storage facility after thickening and filtration
Agitated leaching for high-grade silver concentrate (if applicable)
2-stage ball mill grinding to achieve particle size of 74µm and D80
2-stage cleaning for both lead and zinc concentrates
Concentrate dewatering using thickeners and filter presses
To find out more about our products and solutions, please fll out the form below and one of our experts will get back to you shortly
3000 TPD Gold Flotation Project in Shandong Province
2500TPD Lithium Ore Flotation in Sichuan
Fax: (+86) 021-60870195
Address: No.2555,Xiupu Road, Pudong, Shanghai
Copyright © 2023. Prominer (Shanghai) Mining Technology Co.,Ltd.