Raw Material: Sulfide Flotation Copper Tailings
Metal Concentrate: Copper: 0.8%,Gold: 0.3 g/t,Silver: 5 g/t,Iron: 25%
Target purity: Copper Cathode: 99.95% (Electrowinning),Gold/Silver Ingot: 99.9%,Iron Concentrate: 58% Fe
Recovery Rate: Copper: ≥85%, Gold: 92%, Silver: 90%, Iron: 75%
Capacity: 1800 tons per day
Work Scope: EPC + Technical Optimization
Here are some photos of the project, click on the small picture to view the large picture.
Below are some ways to handle this plan. If you want to get a more detailed plan, please click the button to contact us.
Pre-treatment System: High-intensity grinding to D90 45μm (target liberation); Sulfuric acid pre-leaching (pH 1.5-2.0, 4hrs) for copper dissolution
Iron Extraction Unit: Magnetic separation (1.2T intensity) from leached residue; Concentrate dewatering via drum filter
Environmental Protection: Neutralization tank with lime milk (pH 10.5); Dry stacking with <15% moisture tailings
Ammonia Leaching & Metal Recovery: Ammonia-ammonium carbonate leaching (pH 9.5, 8hrs) for gold/silver extraction; CCD washing + Zinc powder precipitation for precious metals
Copper SX-EW System:2-stage solvent extraction (LIX 984N); Electrowinning to produce A-grade cathode
To find out more about our products and solutions, please fll out the form below and one of our experts will get back to you shortly
3000 TPD Gold Flotation Project in Shandong Province
2500TPD Lithium Ore Flotation in Sichuan
Fax: (+86) 021-60870195
Address: No.2555,Xiupu Road, Pudong, Shanghai
Copyright © 2023. Prominer (Shanghai) Mining Technology Co.,Ltd.