Raw Ore: Oxide/Sulfide Mixed Gold Ore
Gold Grade: 3.5 g/t
Gold Ingot Purity: 99.5%
Gold Recovery Rate: 96%
Capacity: 1800 tons per day
Work Scope: Engineering Design, Equipment Supply, Installation Guidance & Ore Testing
Here are some photos of the project, click on the small picture to view the large picture.
Below are some ways to handle this plan. If you want to get a more detailed plan, please click the button to contact us.
3-stage crushing system with hydraulic jaw crusher → cone crusher → high-pressure grinding rolls (HPGR) to achieve 12mm particle size
Two-stage ball mill grinding (primary overflow ball mill + secondary hydrocyclone closed-circuit) to reach P₈₀=75μm
Gold refinery unit (acid washing → elution → electrowinning → gold smelting furnace)
Centrifugal concentrator for pre-recovery of coarse free gold
CIL leaching system (8 tanks with 30hr retention time, activated carbon adsorption)
Cyanide detoxification system (INCO SO₂/Air process)
Tailings management : High-rate thickener + automatic filter press for dry stacking
To find out more about our products and solutions, please fll out the form below and one of our experts will get back to you shortly
3000 TPD Gold Flotation Project in Shandong Province
2500TPD Lithium Ore Flotation in Sichuan
Fax: (+86) 021-60870195
Address: No.2555,Xiupu Road, Pudong, Shanghai
Copyright © 2023. Prominer (Shanghai) Mining Technology Co.,Ltd.