
Raw Ore: Sulfide Type Gold Ore
Gold Grade: 3.5 g/t
Gold Recovery Rate: 92%
Capacity: 1800 tons per day (Expanded from 1000 TPD)
Work Scope: Plant Expansion, Equipment Supply, and Installation Guidance
Here are some photos of the project, click on the small picture to view the large picture.







Below are some ways to handle this plan. If you want to get a more detailed plan, please click the button to contact us.


3 stage crushing to reduce ore size below 12 mm

1 stage rougher flotation, 2 stage cleaner flotation, and 1 stage scavenging flotation

Thickener and filter press for concentrate dewatering

The expansion project incorporated Wear Resistant Rubber in key equipment to enhance durability, reduce maintenance downtime, and extend service life in abrasive environments.

Wear Resistant Rubber lining applied in ball mills, chutes, and pumps

2 stage ball mill grinding to achieve particle size of 74㎛ and D 80

Tailing disposal system with dry stacking capability
To find out more about our products and solutions, please fll out the form below and one of our experts will get back to you shortly
3000 TPD Gold Flotation Project in Shandong Province
2500TPD Lithium Ore Flotation in Sichuan
Fax: (+86) 021-60870195
Address: No.2555,Xiupu Road, Pudong, Shanghai
Copyright © 2023. Prominer (Shanghai) Mining Technology Co.,Ltd.