Raw Ore: Oxide-Sulfide Mixed Gold Ore
Gold Grade: 3.5-7 g/t
Gold Ingot Purity: 99.5%
Gold Recovery Rate: 95.5%
Capacity: 1800 tons per day
Work Scope: EPC + Automation System
Here are some photos of the project, click on the small picture to view the large picture.
Below are some ways to handle this plan. If you want to get a more detailed plan, please click the button to contact us.
3-stage crushing to 10mm particle size
Single-stage ball mill grinding to 75μm (D85)
Carbon elution & electrowinning
Cyanide destruction (SO₂/Air process)
concentrators for free gold recovery
18-hour leaching in 8-stage CIL system
Gold refining to 99.5% purity
Tailings dewatering with thickener + filter press
To find out more about our products and solutions, please fll out the form below and one of our experts will get back to you shortly
3000 TPD Gold Flotation Project in Shandong Province
2500TPD Lithium Ore Flotation in Sichuan
Fax: (+86) 021-60870195
Address: No.2555,Xiupu Road, Pudong, Shanghai
Copyright © 2023. Prominer (Shanghai) Mining Technology Co.,Ltd.