Raw Ore: Siliceous-Phosphate with Magnetite Inclusions
Feed Composition: P₂O₅: 19-23%;Fe₂O₃: 8-12%;SiO₂: 25-35%;CaO: 32-38%
Final Products: Phosphate Concentrate (P₂O₅ ≥31%, Fe₂O₃ ≤2.0%);Iron Concentrate (Fe ≥65%);Silica Sand (SiO₂ ≥96%)
Recovery Rate: P₂O₅: 90.2%;Fe: 88.5%
Capacity: 1800 tons per day
Work Scope: Ore Characterization, Process Design & Key Equipment Supply
Here are some photos of the project, click on the small picture to view the large picture.
Below are some ways to handle this plan. If you want to get a more detailed plan, please click the button to contact us.
Pre-Beneficiation Circuit:
Advanced Concentration:
Tailings Valorization:
Concentrate thickening → Filter press dewatering
Selective Flotation:
Product Upgrading:
To find out more about our products and solutions, please fll out the form below and one of our experts will get back to you shortly
3000 TPD Gold Flotation Project in Shandong Province
2500TPD Lithium Ore Flotation in Sichuan
Fax: (+86) 021-60870195
Address: No.2555,Xiupu Road, Pudong, Shanghai
Copyright © 2023. Prominer (Shanghai) Mining Technology Co.,Ltd.