Raw Ore: Alluvial/Sulfide Type Gold Ore (depending on specific deposit)
Gold Grade: 3.5 g/t
Gold Recovery Rate: 92%
Capacity: 1800 tons per day
Work Scope: EPC (Engineering, Procurement, Construction)
Here are some photos of the project, click on the small picture to view the large picture.
Below are some ways to handle this plan. If you want to get a more detailed plan, please click the button to contact us.
3-stage crushing to reduce ore size below 12 mm
Gravity concentration for coarse free gold recovery
CIL (Carbon in Leach) system with 24-hour leaching time
Tailing treatment: thickener and filter press for dry stacking
Primary grinding with ball mill to achieve particle size of 74㎛ and D80
Flotation system: 1 stage rougher, 2 stage cleaner, 1 stage scavenger
Elution, electrowinning and gold smelting system
Full plant automation and environmental protection systems
To find out more about our products and solutions, please fll out the form below and one of our experts will get back to you shortly
3000 TPD Gold Flotation Project in Shandong Province
2500TPD Lithium Ore Flotation in Sichuan
Fax: (+86) 021-60870195
Address: No.2555,Xiupu Road, Pudong, Shanghai
Copyright © 2023. Prominer (Shanghai) Mining Technology Co.,Ltd.