Raw Material: Spent gold leaching solution (cyanide-based)
Gold Concentration in Solution 2-5 ppm
Final Product: Regenerated cyanide solution & precious metal sludge
Recovery Rate: 96% (cyanide regeneration)
Capacity: 200 tons per day
Work Scope: EPC (Engineering, Procurement, Construction), Commissioning & Training
Here are some photos of the project, click on the small picture to view the large picture.







Below are some ways to handle this plan. If you want to get a more detailed plan, please click the button to contact us.


Spent solution collection and preliminary filtration to remove solid residues

Heavy metal precipitation with zinc sulfate, followed by thickener and filter press for solid-liquid separation

Activated carbon adsorption column for residual gold recovery from regenerated solution

Sludge dewatering using membrane filter press for dry, stackable cake

Integrated PLC control system for process monitoring, safety interlocks, and data logging

pH adjustment system using sulfuric acid and caustic soda for optimal reaction conditions

Cyanide regeneration via AVR (Acidification-Volatilization-Reneutralization) process:

Regenerated cyanide solution storage tank with concentration monitoring and automated dosing system

Ventilation and HCN gas scrubbing system for workplace safety
To find out more about our products and solutions, please fll out the form below and one of our experts will get back to you shortly
3000 TPD Gold Flotation Project in Shandong Province
2500TPD Lithium Ore Flotation in Sichuan
Fax: (+86) 021-60870195
Address: No.2555,Xiupu Road, Pudong, Shanghai
Copyright © 2023. Prominer (Shanghai) Mining Technology Co.,Ltd.