Raw Ore: Copper Sulfide Ore
Copper Grade: 0.85%
Final Product: Copper Concentrate
Copper Recovery Rate: 93.5%
Capacity: 2000 tons per day
Work Scope: Equipment Supply and Installation
Here are some photos of the project, click on the small picture to view the large picture.
Below are some ways to handle this plan. If you want to get a more detailed plan, please click the button to contact us.
3 stage crushing to produce ore with size below 12 mm
1 stage Rougher flotation
1 stage Scavenging flotation
Thickener and press filter for concentrate dewatering
2 stage ball mill grinding to achieve particle size of 74㎛ and D₈₀
2 stage Cleaner flotation
Tailing pumped to pond after thickener dewatering
Flotation using advanced cells with large air suction volume, energy savings, and easy operation
To find out more about our products and solutions, please fll out the form below and one of our experts will get back to you shortly
3000 TPD Gold Flotation Project in Shandong Province
2500TPD Lithium Ore Flotation in Sichuan
Fax: (+86) 021-60870195
Address: No.2555,Xiupu Road, Pudong, Shanghai
Copyright © 2023. Prominer (Shanghai) Mining Technology Co.,Ltd.