Raw Ore: Oxide Type Gold Ore
Gold Grade: 4 g/t
Gold Ingot Purity: 98%
Gold Recovery Rate: 97%
Capacity: 2000 tons per day
Work Scope: Equipment Supply and Installation Guidance
Here are some photos of the project, click on the small picture to view the large picture.







Below are some ways to handle this plan. If you want to get a more detailed plan, please click the button to contact us.


3 stage crushing to make gold ore with size 12 mm below

Centrifugal concentrator to recover the large size free gold

Elution, desoprtion and electrolysis system and gold refinery system

Cyanide destruction device is also equipped

2 stage ball mill grinding to obtain particle with size 74㎛ and D85

Leaching system with 26 hours leaching time

Thickener and press filter for tailing dewatering and dry stacking

Click the button below for more details
To find out more about our products and solutions, please fll out the form below and one of our experts will get back to you shortly
3000 TPD Gold Flotation Project in Shandong Province
2500TPD Lithium Ore Flotation in Sichuan
Fax: (+86) 021-60870195
Address: No.2555,Xiupu Road, Pudong, Shanghai
Copyright © 2023. Prominer (Shanghai) Mining Technology Co.,Ltd.