Raw Ore: Sulfide Type Gold Ore
Gold Grade: 3.5 g/t
Final Product: Gold Ingot
Gold Recovery Rate: 96%
Gold Ingot Purity: 99%
Capacity: 2000 tons per day
Work Scope: Equipment Design, Supply, Installation Guidance, and Process Optimization
Here are some photos of the project, click on the small picture to view the large picture.
Below are some ways to handle this plan. If you want to get a more detailed plan, please click the button to contact us.
Three-stage crushing to reduce ore size below 12 mm
Flash gravity flotation cell: Combines gravity separation and flotation for synergistic recovery; modular design allows rapid switching between process configurations
Carbon-in-leach (CIL) system with 24-hour leaching time
Tailings dewatering via thickener and filter press for dry stacking
Smart ball mill system: Self-adjusting feed control ensures optimal grinding efficiency; reduces energy consumption by 20% and achieves target fineness of 74μm (D80)
Self-cooling slurry pump: Intelligent temperature control extends service life by 40% and supports high-density slurry handling in flotation and leaching stages
Elution, electrolysis, and gold smelting systems
To find out more about our products and solutions, please fll out the form below and one of our experts will get back to you shortly
3000 TPD Gold Flotation Project in Shandong Province
2500TPD Lithium Ore Flotation in Sichuan
Fax: (+86) 021-60870195
Address: No.2555,Xiupu Road, Pudong, Shanghai
Copyright © 2023. Prominer (Shanghai) Mining Technology Co.,Ltd.