Raw Material: Gold mine tailings slurry from CIL plant
Tailings Solids Content: 35-40%
Final Stacking Density: 1.6-1.8 t/m³
Water Recovery Rate: ≥85%
Storage Capacity: Design capacity for 5 years operation
Work Scope: EPC (Engineering, Procurement, Construction & Commissioning)
Here are some photos of the project, click on the small picture to view the large picture.







Below are some ways to handle this plan. If you want to get a more detailed plan, please click the button to contact us.


Tailings slurry pipeline reception and distribution system

Underflow pumping system (positive displacement pumps) to filter press plant

Dry cake conveyor system to stacking area

Stacking by radial stacker with dust suppression spray system

Recycled water return system to processing plant

Automated control system for entire dewatering and stacking process

High-capacity thickener for primary dewatering with automated flocculant dosing

Membrane filter press system for secondary dewatering to ≤20% moisture content

Lined stacking area with HDPE geomembrane and leak detection system

Stormwater and runoff collection network

Real-time monitoring of stack stability, seepage, and groundwater quality

Environmental closure plan including final cover and revegetation design
To find out more about our products and solutions, please fll out the form below and one of our experts will get back to you shortly
3000 TPD Gold Flotation Project in Shandong Province
2500TPD Lithium Ore Flotation in Sichuan
Fax: (+86) 021-60870195
Address: No.2555,Xiupu Road, Pudong, Shanghai
Copyright © 2023. Prominer (Shanghai) Mining Technology Co.,Ltd.