Raw Ore: Oxide Type Gold Ore
Gold Grade: 3.5 g/t
Gold Recovery Rate: 92%
Gold Ingot Purity: 96%
Capacity: 2000 tons per day
Work Scope: Engineering Design, Equipment Supply, and Installation Guidance
Here are some photos of the project, click on the small picture to view the large picture.
Below are some ways to handle this plan. If you want to get a more detailed plan, please click the button to contact us.
Dry pre-selection with vibrating screen and air classifier to reduce water use
Dry magnetic separation for magnetic mineral removal
Efficient deep cone thickener + chamber filter press for tailings dewatering with flocculant addition
Centralized PLC control for water and dust management
Low-water flotation system with optimized reagent dosing
Process water recycling with high-rate thickener and clear water tank
Enclosed conveyors and dry mist dust suppression systems to control airborne dust
Click the button below for more details
To find out more about our products and solutions, please fll out the form below and one of our experts will get back to you shortly
3000 TPD Gold Flotation Project in Shandong Province
2500TPD Lithium Ore Flotation in Sichuan
Fax: (+86) 021-60870195
Address: No.2555,Xiupu Road, Pudong, Shanghai
Copyright © 2023. Prominer (Shanghai) Mining Technology Co.,Ltd.