Raw Ore: Primary Sulfide Ore (Chalcopyrite-Bornite)
Cu Grade: 0.72%
Concentrate Grade: 28.3%
Recovery Rate: 92%
Capacity: 2200 tons per day
Work Scope: Process Design, Equipment Supply and On-site Commissioning
Here are some photos of the project, click on the small picture to view the large picture.
Below are some ways to handle this plan. If you want to get a more detailed plan, please click the button to contact us.
High-pressure grinding rolls (HPGR) for energy-efficient size reduction to 10 mm
Primary rougher-scavenger circuit for liberated chalcopyrite
Concentrate regrinding to P80=25μm with vertical stirred mill
Filter press dewatering with moisture <8%
Coarse particle flotation (CPT) at P80=150μm to reduce overgrinding
Secondary flash flotation for bornite recovery
Differential flotation for pyrite rejection
Acid generation control system for tailings stabilization
To find out more about our products and solutions, please fll out the form below and one of our experts will get back to you shortly
3000 TPD Gold Flotation Project in Shandong Province
2500TPD Lithium Ore Flotation in Sichuan
Fax: (+86) 021-60870195
Address: No.2555,Xiupu Road, Pudong, Shanghai
Copyright © 2023. Prominer (Shanghai) Mining Technology Co.,Ltd.