Raw Ore: Complex phosphate ore with silica and carbonates
P2O5 Grade: 18.5%
Concentrate Grade: 32% P2O5
Recovery Rate: 88.2%
Capacity: 2500 tons per day
Work Scope: EPC
Here are some photos of the project, click on the small picture to view the large picture.
Below are some ways to handle this plan. If you want to get a more detailed plan, please click the button to contact us.
3 stage crushing system with jaw crusher and cone crusher
Dual reverse flotation for carbonate and silica removal
Concentrate thickening and disc filtration
Tailing dewatering with deep cone thickener
High pressure grinding rolls for size reduction
Attrition scrubbing and desliming cyclones
Acidulation system for fertilizer production
To find out more about our products and solutions, please fll out the form below and one of our experts will get back to you shortly
3000 TPD Gold Flotation Project in Shandong Province
2500TPD Lithium Ore Flotation in Sichuan
Fax: (+86) 021-60870195
Address: No.2555,Xiupu Road, Pudong, Shanghai
Copyright © 2023. Prominer (Shanghai) Mining Technology Co.,Ltd.