Project Title: 300 TPD Modular Gold Processing Equipment Package
Raw Ore: Alluvial Gold Ore & Primary Hard Rock Gold Ore (Mixed Feed Capability)
Feed Gold Grade: 1.2 – 3.5 g/t (variable)
Final Product: Gold Doré Ingot
Gold Recovery Rate: ≥94% (Overall, depending on feed type)
Capacity: 300 tons per day
Work Scope: Complete Equipment Supply, On-site Installation & Commissioning
Here are some photos of the project, click on the small picture to view the large picture.







Below are some ways to handle this plan. If you want to get a more detailed plan, please click the button to contact us.


Modular Crushing & Screening Unit:

Grinding & Classification Module:

Auxiliary & Environmental System:

Flexible & Hybrid Process Flow: Capable of handling both alluvial (placer) and hard rock gold ores through a configurable combination of gravity and cyanidation circuits. Feed type can be switched with minimal adjustment.

High Recovery & Robust Operation: Integrates multiple gold recovery methods (gravity + CIL) to maximize overall recovery across a wide range of gold particle sizes. Equipment selected for ruggedness and ease of maintenance.

Gravity Concentration & Coarse Gold Recovery Circuit:

Cyanidation & Gold Extraction Module:

Modular & Containerized Design: Major equipment pre-assembled on skids or within shipping containers, drastically reducing site installation time and cost. Ideal for remote or difficult-to-access sites.

All-in-One Solution: From crushing to smelting, the package includes all necessary core equipment and auxiliary systems, providing a complete, ready-to-operate processing plant solution.
To find out more about our products and solutions, please fll out the form below and one of our experts will get back to you shortly
3000 TPD Gold Flotation Project in Shandong Province
2500TPD Lithium Ore Flotation in Sichuan
Fax: (+86) 021-60870195
Address: No.2555,Xiupu Road, Pudong, Shanghai
Copyright © 2023. Prominer (Shanghai) Mining Technology Co.,Ltd.