
Raw Ore: Sulfide Type Copper Ore (Low-grade, heterogeneous)
Feed Copper Grade: 0.45%
Concentrate Copper Grade: 25%
Overall Copper Recovery Rate (Post-Retrofit): 90.5%
Capacity: 3000 tons per day (Existing plant capacity)
Work Scope: Retrofit Engineering, Sensor-Based Ore Sorter Supply & Integration, Commissioning
Here are some photos of the project, click on the small picture to view the large picture.







Below are some ways to handle this plan. If you want to get a more detailed plan, please click the button to contact us.


Primary Crushing: Existing jaw crusher retained.

Secondary & Tertiary Crushing & Grinding:

Concentrate & Tailing Handling: Existing thickener and filter systems retained.

Ore Sorting Stage (New):

Flotation:
Waste Rejection at Coarse Size: ~35% of mass rejected as coarse waste before grinding, drastically reducing energy and water consumption in downstream comminution and processing.
Increased Effective Head Grade: Sorter product stream grade increased to ~0.7% Cu, significantly improving flotation efficiency and concentrate quality.
Capacity De-Bottlenecking: Reduced mass flow to grinding and flotation allows the existing plant to operate below design load, increasing availability and reducing maintenance, or allowing for future throughput increase.
Brownfield Integration: Retrofit designed to minimize plant downtime. Sorting system installed parallel to existing circuit during operation, with switch-over during a scheduled shutdown.
To find out more about our products and solutions, please fll out the form below and one of our experts will get back to you shortly
3000 TPD Gold Flotation Project in Shandong Province
2500TPD Lithium Ore Flotation in Sichuan
Fax: (+86) 021-60870195
Address: No.2555,Xiupu Road, Pudong, Shanghai
Copyright © 2023. Prominer (Shanghai) Mining Technology Co.,Ltd.