Raw Ore: Sedimentary Phosphate Rock
P2O5 Grade: 22-26%
Final Concentrate Purity: 32% P2O5
Recovery Rate: 88%
Capacity: 3000 tons per day
Work Scope: EPC
Here are some photos of the project, click on the small picture to view the large picture.
Below are some ways to handle this plan. If you want to get a more detailed plan, please click the button to contact us.
3-stage crushing (Jaw + Cone + Impact Crushers) to reduce ore to ≤15 mm
2-stage ball mill grinding circuit to achieve particle size of 150 μm (D80)
Hydrocyclones for size classification and density separation
Calcination system (900°C) for high-grade product stream
Scrubbing & attrition for clay removal and ore liberation
Rougher/Scavenger/Cleaner flotation circuit with anionic collectors
Concentrate thickening and disc filter dewatering to ≤10% moisture
Tailings neutralization and paste thickener for dry stacking
To find out more about our products and solutions, please fll out the form below and one of our experts will get back to you shortly
3000 TPD Gold Flotation Project in Shandong Province
2500TPD Lithium Ore Flotation in Sichuan
Fax: (+86) 021-60870195
Address: No.2555,Xiupu Road, Pudong, Shanghai
Copyright © 2023. Prominer (Shanghai) Mining Technology Co.,Ltd.