Raw Ore: Magnetite Iron Ore with Hematite Banding
Fe Grade: 28-32%
Final Product: High-Grade Iron Concentrate
Concentrate Specification: Fe≥68%, SiO₂≤2.5%, P≤0.03%
Recovery Rate: 92%
Capacity: 3500 tons per day
Work Scope: EPCM + Automation
Here are some photos of the project, click on the small picture to view the large picture.
Below are some ways to handle this plan. If you want to get a more detailed plan, please click the button to contact us.
Primary Crushing:Gyratory crusher → 250mm size reduction
Grinding Circuit:HPGR (High Pressure Grinding Rolls) + Ball mill → P80=45μm
Concentrate Upgrading:Reverse flotation with amine collectors (SiO₂ reduction); Disc filters for dewatering to 9% moisture
Tailings Management:Paste thickener → Filter press → Dry stacking (85% solids); Water recovery >90%
Pre-beneficiation:Dense Medium Separation (DMS) cyclones discard 35% waste rock
Magnetic Separation:3-stage LIMS (Low Intensity Magnetic Separation);WHIMS (Wet High Intensity Magnetic Separation) for hematite recovery
Pellet Feed Preparation: Balling discs → 12mm green pellets; Grate-Kiln induration system (1315°C)
To find out more about our products and solutions, please fll out the form below and one of our experts will get back to you shortly
3000 TPD Gold Flotation Project in Shandong Province
2500TPD Lithium Ore Flotation in Sichuan
Fax: (+86) 021-60870195
Address: No.2555,Xiupu Road, Pudong, Shanghai
Copyright © 2023. Prominer (Shanghai) Mining Technology Co.,Ltd.