Raw Ore: Dual Oxide & Sulfide Gold Ore (Refractory in parts)
Gold Grade: 3.5-4.2 g/t
Final Product: Gold Doré (Au ≥96.5%)
Gold Recovery Rate: 92.5%
Capacity: 500 tons per day
Work Scope: Modular Plant Design, Equipment Supply, Installation & Local Training
Here are some photos of the project, click on the small picture to view the large picture.
Below are some ways to handle this plan. If you want to get a more detailed plan, please click the button to contact us.
Pre-Concentration & Comminution:
CIL Circuit Design:
Tailings Management:
Pre-Treatment for Refractory Gold:
Gold Recovery:
Technical Highlights: