Raw Material: Quartzite Rock (SiO₂: 97.8%)
Photovoltaic Grade: SiO₂≥99.99%, Fe₂O₃≤10ppm
Semiconductor Grade: SiO₂≥99.997%, Al≤20ppm
Final Product: High-Purity Quartz Sand
Recovery Rate: 92%
Capacity: 500 tons per day
Work Scope: Turnkey Solution (Design to Commissioning)
Here are some photos of the project, click on the small picture to view the large picture.
Below are some ways to handle this plan. If you want to get a more detailed plan, please click the button to contact us.
Crushing & Scrubbing:2-stage jaw/cone crushing → Particle size ≤20mm;Attrition scrubbing for clay removal
Magnetic Separation:3-stage WHIMS (20,000 Gauss);Remove Fe/Ti impurities
Chemical Purification:Hot acid leaching (HCl/H₂SO₄);Remove surface impurities
Classification & Desliming:Hydraulic classifier: Remove -0.1mm fines;Spiral separator: Discard heavy minerals
Flotation:Acidic flotation (HF-free process);Remove feldspar & mica
Drying & Packaging:Rotary dryer → Moisture ≤0.2%;Classified into 4 purity grades
To find out more about our products and solutions, please fll out the form below and one of our experts will get back to you shortly
3000 TPD Gold Flotation Project in Shandong Province
2500TPD Lithium Ore Flotation in Sichuan
Fax: (+86) 021-60870195
Address: No.2555,Xiupu Road, Pudong, Shanghai
Copyright © 2023. Prominer (Shanghai) Mining Technology Co.,Ltd.