Raw Ore: Copper-Gold Ore
Copper Grade: 1.2%
Gold Grade: 1.5 g/t
Recovery Rate: Copper 89%, Gold 88%
Capacity: 5000 tons per day
Work Scope: EPC (Engineering, Procurement, Construction)
Here are some photos of the project, click on the small picture to view the large picture.
Below are some ways to handle this plan. If you want to get a more detailed plan, please click the button to contact us.
Build trenches, lay pipes, and set sedimentation tanks to keep the site dry
Install drainage layers, overflow channels, and emergency ponds to handle stormwater
3 stage crushing to reduce ore size below 15 mm
Flotation system for copper-gold separation (rougher, cleaner, scavenger stages)
Tailings pumped to lined pond after neutralization
Use compacted soil + gravel + concrete to raise equipment platforms above water
Prefab and fast-assemble steel structures cut down on wet-weather delays
2 stage ball mill grinding to achieve particle size of 75 µm (D80)
Concentrate dewatering via thickener and filter press
To find out more about our products and solutions, please fll out the form below and one of our experts will get back to you shortly
3000 TPD Gold Flotation Project in Shandong Province
2500TPD Lithium Ore Flotation in Sichuan
Fax: (+86) 021-60870195
Address: No.2555,Xiupu Road, Pudong, Shanghai
Copyright © 2023. Prominer (Shanghai) Mining Technology Co.,Ltd.