Raw Ore: Hematite-Magnetite Mixed Ore (Ratio 60:40)
Fe Grade: 36-42%
Final Product: High-Grade Iron Concentrate Pellets
Concentrate Specification: Fe≥67%, SiO₂≤2.0%, P≤0.025%
Recovery Rate: 89% (Magnetite 95%, Hematite 83%)
Capacity: 500 tons per hour
Work Scope: EPC + Process Guarantee
Here are some photos of the project, click on the small picture to view the large picture.
Below are some ways to handle this plan. If you want to get a more detailed plan, please click the button to contact us.
Reverse Flotation Circuit:
Impurity | Removal Rate | Reagent Consumption |
---|---|---|
SiO₂ | 92% | Amine 120g/t |
P₂O₅ | 85% | Fatty Acid 80g/t |
Dry screening: Discard -2mm low-grade fines (15% mass)
Low-Intensity Magnetic Separation (LIMS):Magnetite recovery: 3-stage drum separators (0.2T);Concentrate grade: Fe 68.5% (SiO₂ 2.8%)
High-Gradient Magnetic Separation (HGMS): Hematite recovery: SLon-5000 pulsating separators (1.8T); Concentrate grade: Fe 62.0% (SiO₂ 5.5%)
Concentrate Dewatering:High-rate thickeners (ø45m) → Underflow 55% solids; Vacuum disc filters → Moisture ≤9%
Pelletizing System
To find out more about our products and solutions, please fll out the form below and one of our experts will get back to you shortly
3000 TPD Gold Flotation Project in Shandong Province
2500TPD Lithium Ore Flotation in Sichuan
Fax: (+86) 021-60870195
Address: No.2555,Xiupu Road, Pudong, Shanghai
Copyright © 2023. Prominer (Shanghai) Mining Technology Co.,Ltd.