Raw Material: Polymetallic Ore Containing Galena (PbS) and Fluorite (CaF₂)
Lead Grade: 3.5%
Fluorite Grade: 35%
Final Products: Lead Concentrate (≥60% Pb);Acid-Grade Fluorite Concentrate (≥97% CaF₂)
Recovery Rate: Lead Recovery: 92%; Fluorite Recovery: 80%
Capacity: 800 tons per day
Work Scope: Engineering Design, Equipment Supply, Installation Guidance
Here are some photos of the project, click on the small picture to view the large picture.
Below are some ways to handle this plan. If you want to get a more detailed plan, please click the button to contact us.
Crushing & Screening System:
Sequential Flotation Circuit:
Tailings Management:
Grinding & Classification:
Concentrate Dewatering:
Automation & Reagent Control:
To find out more about our products and solutions, please fll out the form below and one of our experts will get back to you shortly
3000 TPD Gold Flotation Project in Shandong Province
2500TPD Lithium Ore Flotation in Sichuan
Fax: (+86) 021-60870195
Address: No.2555,Xiupu Road, Pudong, Shanghai
Copyright © 2023. Prominer (Shanghai) Mining Technology Co.,Ltd.