Raw Ore: Sulfide Type Molybdenum Ore (Mainly Molybdenite)
Mo Grade: 0.15%
Concentrate Grade: 45% Mo
Molybdenum Recovery Rate: 85%
Capacity: 800 tons per day
Work Scope: EPC (Engineering, Procurement, Construction)
Here are some photos of the project, click on the small picture to view the large picture.
Below are some ways to handle this plan. If you want to get a more detailed plan, please click the button to contact us.
3-Stage Crushing System:
Jaw crusher → Cone crusher → HPGR (High Pressure Grinding Rolls)
Output size: ≤12 mm
Molybdenum Flotation Circuit:
1-stage Rougher flotation (with Xanthate collector)
3-stage Cleaner flotation (column flotation cells)
2-stage Scavenger flotation
Reagent system: Diesel oil as frother, Sodium silicate as depressant
Tailings Management:
Tailings thickener → Paste backfill system
Dry stacking with geotextile membrane
Grinding & Classification System:
2-stage ball mill closed-circuit with hydrocyclones
Target particle size: 74㎛ (D80)
Concentrate Dewatering:
Concentrate thickener → Filter press
Final moisture: ≤12%
Automation & Control:
Online XRF analyzer for grade monitoring
PLC centralized control system
To find out more about our products and solutions, please fll out the form below and one of our experts will get back to you shortly
3000 TPD Gold Flotation Project in Shandong Province
2500TPD Lithium Ore Flotation in Sichuan
Fax: (+86) 021-60870195
Address: No.2555,Xiupu Road, Pudong, Shanghai
Copyright © 2023. Prominer (Shanghai) Mining Technology Co.,Ltd.