Raw Ore: Mixed Type Gold Ore (Oxide & Sulfide)
Gold Grade: 2.8 g/t
Gold Recovery Rate: 92% (Post-Optimization)
Capacity: 2000 tons per day
Work Scope: Process Optimization, Agitation System Upgrade & Reagent Control System Installation
Here are some photos of the project, click on the small picture to view the large picture.
Below are some ways to handle this plan. If you want to get a more detailed plan, please click the button to contact us.
3-stage crushing to achieve particle size below 15 mm
Optimized agitation leaching system with PLC-controlled reagent dosing
Activator/Dispersant ratio optimization module
24-hour retention time in upgraded dual-impeller agitation tanks
Advanced tailings treatment with cyanide detoxification unit
Pre-leaching centrifugal concentration for free gold recovery
Sodium cyanide concentration: 0.03-0.05% (Dynamic adjustment)
Real-time pH monitoring system (Range: 10.5-11.2)
Carbon-in-leach (CIL) circuit with automated carbon management
To find out more about our products and solutions, please fll out the form below and one of our experts will get back to you shortly
3000 TPD Gold Flotation Project in Shandong Province
2500TPD Lithium Ore Flotation in Sichuan
Fax: (+86) 021-60870195
Address: No.2555,Xiupu Road, Pudong, Shanghai
Copyright © 2023. Prominer (Shanghai) Mining Technology Co.,Ltd.