Raw Ore: Gold ore with high arsenic content
Gold Grade: 3.5 g/t
Arsenic Content: 2.1%
Gold Recovery Rate: 88%
Capacity: 100 tons per day
Work Scope: Process Design, Equipment Supply, and Installation Guidance
Here are some photos of the project, click on the small picture to view the large picture.







Below are some ways to handle this plan. If you want to get a more detailed plan, please click the button to contact us.


Three-stage crushing to reduce ore size below 10 mm

Flotation system for arsenic-gold separation

Arsenic stabilization and safe disposal system

Roasting system for arsenic removal and gold encapsulation

CIL (Carbon in Leach) system for gold extraction

Tailings treatment with arsenic fixation and dry stacking
To find out more about our products and solutions, please fll out the form below and one of our experts will get back to you shortly
3000 TPD Gold Flotation Project in Shandong Province
2500TPD Lithium Ore Flotation in Sichuan
Fax: (+86) 021-60870195
Address: No.2555,Xiupu Road, Pudong, Shanghai
Copyright © 2023. Prominer (Shanghai) Mining Technology Co.,Ltd.