Raw Ore: Oxide Type Gold Ore
Gold Grade: 2.5 g/t
Gold Ingot Purity: 92%
Gold Recovery Rate: 89%
Capacity: 100 tons per day
Work Scope: Equipment Supply and Installation Guidance
Here are some photos of the project, click on the small picture to view the large picture.
Below are some ways to handle this plan. If you want to get a more detailed plan, please click the button to contact us.
2 stage crushing to reduce ore size below 10 mm
CIL leaching system with 20 hours retention time
Gold smelting furnace for ingot production
1 stage ball mill grinding to achieve particle size of 74㎛ and D 80
Carbon adsorption, elution, and electrolysis system
Tailing dewatering system with filter press for dry stacking
To find out more about our products and solutions, please fll out the form below and one of our experts will get back to you shortly
3000 TPD Gold Flotation Project in Shandong Province
2500TPD Lithium Ore Flotation in Sichuan
Fax: (+86) 021-60870195
Address: No.2555,Xiupu Road, Pudong, Shanghai
Copyright © 2023. Prominer (Shanghai) Mining Technology Co.,Ltd.