Client: Heavy Mineral Sands Producer
Feedstock: Ilmenite Concentrate (TiO₂ 52-55%)
Final Product: Rutile-Grade TiO₂ (≥94% purity)
Capacity: 800 TPD (Single Line Retrofit)
Work Scope: EPC Modernization
Here are some photos of the project, click on the small picture to view the large picture.
Below are some ways to handle this plan. If you want to get a more detailed plan, please click the button to contact us.
Pre-Leach Treatment:Dry grinding to 45μm & magnetic separation for Fe reduction.
Hydrolisis Control:Seed crystal optimization for uniform rutile crystal growth.
Post-Processing:Surface modification with Al₂O₃/SiO₂ coating for pigment quality.
Enhanced Acid Digestion:H₂SO₄ pressure leaching (230°C/24 bar) with TiO₂ recovery >97%.
Calcination Upgrade:Rotary kilns retrofitted with staged temperature zones (850°C → 1,050°C).
Effluent Recycling:Acid regeneration (≥80% H₂SO₄ recovery) & iron byproduct conversion.
To find out more about our products and solutions, please fll out the form below and one of our experts will get back to you shortly
3000 TPD Gold Flotation Project in Shandong Province
2500TPD Lithium Ore Flotation in Sichuan
Fax: (+86) 021-60870195
Address: No.2555,Xiupu Road, Pudong, Shanghai
Copyright © 2023. Prominer (Shanghai) Mining Technology Co.,Ltd.