

Raw Ore: South African Chrome Ore
Original Cr₂O₃ Grade: 38%
Upgraded Concentrate Grade: 46%
Recovery Rate: 92%
Capacity: 1800 tons per day
Work Scope: Process Design, Equipment Supply, and Installation Guidance
Here are some photos of the project, click on the small picture to view the large picture.







Below are some ways to handle this plan. If you want to get a more detailed plan, please click the button to contact us.


3-stage crushing to reduce ore size below 10mm

Regrinding of middlings for liberation enhancement

Tailings disposal system with dry stacking capability

High-intensity magnetic separation system replacing original spiral chutes and shaking tables

Concentrate dewatering via thickener and filter press

PLC-based automated control system for process optimization
To find out more about our products and solutions, please fll out the form below and one of our experts will get back to you shortly
3000 TPD Gold Flotation Project in Shandong Province
2500TPD Lithium Ore Flotation in Sichuan
Fax: (+86) 021-60870195
Address: No.2555,Xiupu Road, Pudong, Shanghai
Copyright © 2023. Prominer (Shanghai) Mining Technology Co.,Ltd.