Are Current Iron Ore Dry Separation Processes Cost-Effective?


What Equipment is Vital for Copper Concentrate Refinement?


How to achieve solar-grade purity in quartz sand processing?


Which Equipment Maximizes Efficiency in Copper Sulphide Ore Extraction?


Gold Vat Leaching

Gold Vat Leaching

Vat leaching is a good option for the project owner to start at initial stage to save investment

Hard Carbon Anode

Hard Carbon Anode

Hard carbon anode material is the most preferred materials for commercialization of sodium-ion battery

Natural Graphite Anode

Natural Graphite Anode

Prominer can provide the complete solution for making natrual graphite anode materials include grinding

500 TPD High-Purity Quartz Sand Project in Vietnam

500 TPD High-Purity Quartz Sand Project in Vietnam

Raw Material: Quartzite Rock (SiO₂: 97.8%) Photovoltaic Grade: SiO₂≥99.99%, Fe₂O₃≤10ppm

1500 TPD High-Silica Phosphate Ore Processing Plant in Jordan

1500 TPD High-Silica Phosphate Ore Processing Plant in Jordan

Raw Ore: High-Silica Phosphate Ore P2O5 Grade: 22% SiO2 Content: 35%

1800 TPD Gold Processing Plant Expansion in Ghana

1800 TPD Gold Processing Plant Expansion in Ghana

Raw Ore: Sulfide Type Gold Ore Gold Grade: 3.5 g/t Gold Recovery Rate: 92%

10 tpd Mobile Gold Processing Plant in Laos

10 tpd Mobile Gold Processing Plant in Laos

Features: Compact layout, full process coverage, low investment cost, and fast deployment. Designed for Startups & Small Mines — Your flexible and efficient gold solution!

2500 TPD Lithium Spodumene Flotation Plant with Hydrocyclones in Australia

2500 TPD Lithium Spodumene Flotation Plant with Hydrocyclones in Australia

Raw Ore: Lithium Spodumene Ore Li₂O Grade: 1.45% Concentrate Grade: 6.20%

1500 TPD Gold Mine CIL Expansion Project in Malaysia

1500 TPD Gold Mine CIL Expansion Project in Malaysia

Raw Ore: Refractory and Semi-Refractory Sulfide Gold Ore Gold Grade: 2.65 g/t Gold Ingot Purity: ≥95.5%

1500 TPD Molybdenum Flotation Plant in China

1500 TPD Molybdenum Flotation Plant in China

Raw Ore: Sulfide-Type Molybdenum Ore (Molybdenite) Head Grade: 0.15% Mo Concentrate Grade: ≥ 55% Mo

500 to 850 TPD Cu-Pb-Zn Polymetallic Ore Processing Plant Capacity Expansion Without Production Stoppage

500 to 850 TPD Cu-Pb-Zn Polymetallic Ore Processing Plant Capacity Expansion Without Production Stoppage

Capacity Target: Increase processing capacity from 500 TPD to 850 TPD in phases without halting production.

Liner Bolt Removal Hammer

Liner Bolt Removal Hammer

We can manufacture the highly automated and powerful recoilless Bolt Hammer to remove

Baking Furnace

Baking Furnace

Prominer provides various types of furnaces for primary and secondary baking of carbon

Jet Mill, Fluidized Bed Jet Mill,Air Jet Mill

Jet Mill, Fluidized Bed Jet Mill,Air Jet Mill

Jet mill is also called fluidized bed jet mill by using multiple nozzles to form sonic speed air flow

Roller Mill

Roller Mill

We can provide the roller mill for making ultra-fine powder which is suitable to grind

LIMS Magnetic Separator

LIMS Magnetic Separator

Prominer can provide different LIMS (Low Intensity Magnetic separator) magnetic separators

Graphitization Furnace

Graphitization Furnace

We can provide different type graphitization furnace for changing carbon material

Products

Solutions

Case

contact us

WhatsApp

Contact Form